A completed commercial fusion power plant on a re-naturalised former grid-battery site at sunrise, transmission lines leading to a city skyline.

2038 — fusion, working

FormulaFusion

Every serious fusion developer, one comparable dataset — with the evidence graded.

An independent, bilingual index of the companies building fusion power plants: what they claim, what they have shown, and where the first machines could plug in.

How to read this index

Championship A ranks developers on time-averaged power density at their design point. No private developer has yet disclosed a matched power-and-volume pair, so that ranking is deliberately empty for now.

Championship B is the evidence grade, E1 to E5. It rates how much of a company's technical claim has actually been shown, and it is always published beside — never blended into — the number.

Data confidence, separately, rates how well we sourced each row. Every row carries its sources, both ratings and an as-of date, and every company is invited to correct its own row.

  • Evidence grade E11Measured on hardware of that class
  • Evidence grade E22Subscale demonstrated and larger machine under construction
  • Evidence grade E33Design point published with independent technical backing
  • Evidence grade E44Company-stated design point, no independent validation
  • Evidence grade E55Inferred from partial or indirect disclosure

Read the methodology

Developers with a named flagship site — where a real siting conversation is plausible in the next 24 months.

  • Helion EnergyEvidence grade E22Orion plant, Malaga, WANamed site; under construction
  • General FusionEvidence grade E33Italy (site TBD under Renexia framework)Framework/MOU stage — milestone-based, no site named yet
  • TAE TechnologiesEvidence grade E33Under evaluation — multiple US statesActive site evaluation (not yet named)
  • Type One EnergyEvidence grade E33Bull Run (former TVA coal plant), Anderson County, TN + UK site TBDNamed US site (retired coal repurposing); UK site under consortium development
  • Zap EnergyEvidence grade E33Centralia, WA (feasibility stage)Feasibility study underway; not yet a named commitment
  • Commonwealth Fusion SystemsEvidence grade E44Fall Line Fusion Power Station, Chesterfield County, VANamed site; PJM interconnection application filed Apr 2026

40 results