2038 — fusion, working
Every serious fusion developer, one comparable dataset — with the evidence graded.
An independent, bilingual index of the companies building fusion power plants: what they claim, what they have shown, and where the first machines could plug in.
Start here
How to read this index
Championship A ranks developers on time-averaged power density at their design point. No private developer has yet disclosed a matched power-and-volume pair, so that ranking is deliberately empty for now.
Championship B is the evidence grade, E1 to E5. It rates how much of a company's technical claim has actually been shown, and it is always published beside — never blended into — the number.
Data confidence, separately, rates how well we sourced each row. Every row carries its sources, both ratings and an as-of date, and every company is invited to correct its own row.
- Measured on hardware of that class
- Subscale demonstrated and larger machine under construction
- Design point published with independent technical backing
- Company-stated design point, no independent validation
- Inferred from partial or indirect disclosure
Named sites and grid connections
Developers with a named flagship site — where a real siting conversation is plausible in the next 24 months.
Helion EnergyOrion plant, Malaga, WANamed site; under construction
General FusionItaly (site TBD under Renexia framework)Framework/MOU stage — milestone-based, no site named yet
TAE TechnologiesUnder evaluation — multiple US statesActive site evaluation (not yet named)
Type One EnergyBull Run (former TVA coal plant), Anderson County, TN + UK site TBDNamed US site (retired coal repurposing); UK site under consortium development
Zap EnergyCentralia, WA (feasibility stage)Feasibility study underway; not yet a named commitment
Commonwealth Fusion SystemsFall Line Fusion Power Station, Chesterfield County, VANamed site; PJM interconnection application filed Apr 2026