Type One Energy

United States · Knoxville, TN (+ Madison WI, Clinton MD)Founded 2019Plant developerFF005

Evidence grade E33
Design point published with independent technical backing
Data confidence: High

Overview

Confinement
Stellarator
Fuel cycle
D-T
Development stage
Demo under construction
Key milestone
Published first unified fusion power plant design basis; HTS magnet test campaign confirmed key design elements; UK Infinity Fusion Consortium formed with Tokamak Energy + AECOM, May 2026
Target first commercial power
Mid-2030s
Notes
PRIORITY 1 for Dispatch: the clearest retired-generation-asset-to-fusion precedent in the sector, AND now actively seeking a European (UK) site via a consortium that includes an EPC (AECOM). Directly analogous to what Dispatch offers.

Design point

Design net power
350 MWMWe (Infinity Two, design target)
Reactor island volume
PENDING
Time-averaged power density
pending volume
Evidence grade
Evidence grade E33E3
Grade rationale
Published a peer-reviewed-style unified power plant design basis and confirmed HTS magnet design elements through a test campaign — stronger than company-stated-only. Infinity One demonstrator not yet built.

Funding

Lifetime funding
US$ 169M
Latest round
Venture-backed since 2023; cumulative ~$169M
Key investors
Emerson Collective, Engine Ventures, GS Futures, TDK Ventures

Siting

Flagship site
Bull Run (former TVA coal plant), Anderson County, TN + UK site TBD
Siting status
Named US site (retired coal repurposing); UK site under consortium development
Offtake / PPA
TVA cooperative agreement

Grid fit

The metric set that maps onto ex-battery sites. Pending cells are open questions for the company.

As of
August 9, 2026Medium
Footprint (ha, FOAK)
PENDING (repurposing existing Bull Run coal plant footprint)
Cooling type
Water (existing coal-plant cooling infrastructure may be reusable)
Grid connection class
Existing TVA transmission connection at Bull Run
Startup import load
PENDING
Conversion type
Thermal (steam cycle, expected)
Ramp capability
PENDING
Notes
Reuse of an existing coal-plant grid connection is the single clearest Dispatch-relevant precedent in the sector.

Sources

As listed in the Phase-0 Master Index; URLs to be added during right-of-reply.

  1. Business Wire / AECOM press release, May 2026company_primary · Company press release · press-release wire
  2. arxiv.org/html/2606.01344academic_paper
  3. company/TVA announcementscompany_primary

As of: August 9, 2026