TAE Technologies

United States · Foothill Ranch, CAFounded 1998Plant developerFF003

Evidence grade E33
Design point published with independent technical backing
Data confidence: High

Overview

Confinement
FRC (advanced beam-driven)
Fuel cycle
p-B11 (D-T/D-D interim)
Development stage
Prototype operating
Key milestone
Multi-state US site evaluation for first 50MWe plant, Mar 2026
Target first commercial power
Early 2030s
Notes
Merging with TMTG (Nasdaq: DJT); site criteria include 20+ acres and primary distribution grid access.

Design point

Design net power
50 MWMWe (first plant, design target)
Reactor island volume
PENDING
Time-averaged power density
pending volume
Evidence grade
Evidence grade E33E3
Grade rationale
Beam-driven FRC physics basis published across multiple peer-reviewed papers; net-power design not yet demonstrated.

Funding

Lifetime funding
US$ 1,350M
Latest round
Merger financing w/ Trump Media & Technology Group, announced Dec 2025
Key investors
Google, Chevron, Wellcome Trust, Kuwait Investment Authority, Sumitomo

Siting

Flagship site
Under evaluation — multiple US states
Siting status
Active site evaluation (not yet named)
Offtake / PPA
None disclosed

Grid fit

The metric set that maps onto ex-battery sites. Pending cells are open questions for the company.

As of
August 9, 2026Medium
Footprint (ha, FOAK)
20+ acres minimum stated for initial site
Cooling type
PENDING
Grid connection class
Primary distribution grid access required per stated site criteria
Startup import load
PENDING
Conversion type
PENDING
Ramp capability
PENDING
Notes
Stated site criteria: 20+ acre minimum, primary distribution grid access, skilled-labour proximity.

Sources

As listed in the Phase-0 Master Index; URLs to be added during right-of-reply.

  1. GlobeNewswire, Jan 2026company_primary · Company press release · press-release wire
  2. PRNewswire, Mar 2026company_primary · Company press release · press-release wire