Skip to content
FormulaFusion

tracking the world's fusion effort

FormulaFusion

Every serious fusion programme, one comparable dataset.

Private fusion developers ranked on time-averaged power density, with a separate evidence grade for every claim. Every row lists its sources, an evidence grade, a data-confidence rating and an as-of date.

The index today

40
entities tracked
35
plant developers
62
source references
15
confinement concepts

Championship A (design-point power density) is not yet ranked: no private developer has publicly disclosed a matched power and island-volume pair. Volumes show as “—” by design.

Championship B — evidence grades

Rates the company's technical claim, published beside — never blended into — the density number.

  • Evidence grade E11Measured on hardware of that class
  • Evidence grade E22Subscale demonstrated and larger machine under construction
  • Evidence grade E33Design point published with independent technical backing
  • Evidence grade E44Company-stated design point, no independent validation
  • Evidence grade E55Inferred from partial or indirect disclosure

Developers with a named flagship site — where a real siting conversation is plausible in the next 24 months.

  • Helion EnergyEvidence grade E22Orion plant, Malaga, WANamed site; under construction
  • General FusionEvidence grade E33Italy (site TBD under Renexia framework)Framework/MOU stage — milestone-based, no site named yet
  • TAE TechnologiesEvidence grade E33Under evaluation — multiple US statesActive site evaluation (not yet named)
  • Type One EnergyEvidence grade E33Bull Run (former TVA coal plant), Anderson County, TN + UK site TBDNamed US site (retired coal repurposing); UK site under consortium development
  • Zap EnergyEvidence grade E33Centralia, WA (feasibility stage)Feasibility study underway; not yet a named commitment
  • Commonwealth Fusion SystemsEvidence grade E44Fall Line Fusion Power Station, Chesterfield County, VANamed site; PJM interconnection application filed Apr 2026

40 results